HomeMy WebLinkAbout0118417-Building (siding)
0
OSHKOSH
ON THE WATER
Job Address 1155 GREENFIELD TRL
CITY OF OSHKOSH
No
118417
BUILDING PERMIT - APPLICATION AND RECORD
Owner RICK D PEPPLER
Create Date
03/08/2006
Designer
Contractor
SALZER SIDING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq,Ft.
Rooms
0
Height 0 Ft.
D Projection I
Finished/Living
Bedrooms 0
Stories
Canopies
Garage
~Sq,Ft,
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ~
# Structures
-~
Use/Nature SFR/ REplace hardboard siding with vinyi siding on detached garage only
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,600.00 Plan Approval -~ Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
Date 03/08/2006
Final/O.P, 00/00/0000
D Permit Voided I
Parcelld # 1314500000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 825
Agent/Owner
OSHKOSH
WI 54903 - 0825
Telephone Number
(920) 231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.