HomeMy WebLinkAbout0118410-Plumbing (additonal work to 117658)
e
OSHKOSH
ON THE WATER
Job Address 537 W 9TH AVE
CITY OF OSHKOSH
No
118410
PLUMBING PERMIT - APPLICATION AND RECORD
Owner ANDERSON & SONS OSHKOSH INC
Create Date 03/07/2006
Contractor D.R. HANSEN PLBG.
Bathtub 0
Whirlpool ~
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater ~
Site Drain ~
Roof Drain 0
Misc. 0
Fixtures
Use/Nature
ofWork
Valuation
Issued By
Category 410- Residential-Interior
Plan
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
WaterSoftner 0
Local Waste ~
Clothes Wshr 1
Bidet 0
Beer Tap 0
Lab Sink 0
Sterilizer 0
Dip Well ~
Drink Ftn 0
0
0
1
1
1
0
0
~
0
Wail.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0 Shamp Sink ~
0 Flr/Wst Sink 0
0 Catch Basin 0
0 Wash Ftn 0
~ Urinal 0
~ Standp Rec 1
0 Ice Maker 0
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap ~
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Work in addition to that on permit #117658, fixtures not included (Debit account)
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1300060000
$1,000.00
$0.00
$35.00 U Permit Voided i
Plan Approval
Permit Fees
Date 03/07/2006
In the performance of this work, i agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvais before starting such activity.
Address 55 KNAPP ST
Signature
Date
AgenUOwner
OSHKOSH
WI 54902 - 0000
Telephone Number
233-1595
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
I
~