HomeMy WebLinkAbout2006-Plumbing (water heater)
Gas water heater' (debit acct)
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 0607370000
e
OSHKOSH
ON THE WATER
Job Address 1111 WITZEL AVE
Contractor MOREMAN PLUMBING
Bathtub ~
Whirlpool ~
Lavatory ~
Toilet 0
Res. Sink ~
Bar Sink 0
Water Heater 1
Site Drain 0
Roof Drain ~
Misc. 0
Fixtures
Use/Nature
of Work
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
Valuation
$500.00
Issued By
CITY OF OSHKOSH No 118400
PLUMBING PERMIT - APPLICATION AND RECORD
Owner THOMAS POESCHLJR ETAL Create Date ~
Category 411 - Residential-Water Heaters Plan
0 Water Softner 0 Wait. St. 0 Shamp Sink ~ Coffee Maker 0
0 Local Waste 0 Ice Chest ~ Flr/Wst Sink 0 Int Grease Trap ~
0 Clothes Wshr 0 Exam Sink 0 Catch Basin ~ Ext Grease Trap 0
0 Bidet 0 Sculry Sink ~ Wash Ftn ~ RPZ Valve ~
0 Beer Tap 0 Hand Sink 0 Urinal ~ Eye Wash Statn ~
0 Lab Sink 0 Plaster Sink 0 Standp Rec ~ Wtr Sewer Mtrs 0
0 Sterilizer 0 Surgeons Sink ~ Ice Maker 0 Deduct Meters ~
0 DipWell 0 F Prep Sink ~ Gar Drain 0 Wtr Usage Mtrs ~
0 Drink Ftn 0 Serv Sink ~ Soda Disp ~
Plan Approval
$0.00
Permit Fees
$20.00 0 Permit Voided I
Date~
In the performance of this work. i agree to perfomn ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongiy urges the permit applicant to contact the
easement hoider(s) and to secure any necessary approvals before starting such activity.
Date
Signature
WI 54903 - 0000
Telephone Number
Agent/Owner
OSHKOSH
231-9191
Address PO BOX 1325
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.