HomeMy WebLinkAbout0118411-Building (handicap ramp)
ê
OSHKOSH
ON THE WATER
Job Address 1602 THORNTON DR
CITY OF OSHKOSH
BUILDING PERMIT -APPLICATION AND RECORD
No
118411
Owner JERRIL YN SCHMIDT
Create Date
03/07/2006
Designer
Contractor
OWNER
Category
142 - Decks. Patios. Ramps
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature
ofWork
FR/ Constructing a ramp in the front yard. A physicians statement will be submitted indicating the need for a ramp.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$640.00 Plan Approval
~J
$0.00 Penmit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 03/07/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1317240000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonm the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature )LJ;?!u",.l ,~/.:t. -¿þZ<::u~¡ßP-n.J ~;h,~~
/ Age'¡;UOwner ¡!/
OSHKOSH
Date y 5'/7k-6
/
Address 1602 THORNTON DR
WI 54904 - 8293
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.