Loading...
HomeMy WebLinkAbout0118399-Plumbing (laterals) e OSHKOSH ON THE WATER Job Address 1250 HEIDI HAVEN DR CITY OF OSHKOSH PLUMBING PERMIT. APPLICATION AND RECORD No 118399 OWner RUSCH HOMES LLC Category 401 - Residential-Exterior (laterals) Contractor J & P EXCAVATING Create Date 03/07/2006 Plan Bathtub 0 Shower 0 Water Softner 0 Wail.SI. 0 Whirlpool 0 Floor Drain --'l Local Waste 0 Ice Chest 0 Lavatory 0 Lndry Tray --'l Clothes Wshr 0 Exam Sink 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink --'l Site Drain 0 Breakrm Sink --'l DipWell 0 F Prep Sink 0 Roof Drain 0 Ejector/Grind --'l Drink Ftn 0 Serv Sink 0 Misc. 0 Fixtures Shamp Sink --'l FlrlWst Sink 0 Catch Basin 0 Wash Ftn 0 Urinal 0 Standp Rec --'l Ice Maker 0 Gar Drain 0 Soda msp 0 Coffee Maker --'l Int Grease Trap --'l Ext Grease Trap --'l RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Use/Nature ofWork r'ffi~'." (oo""ct) Sanitary Sewer Size 4" Type Lateral Material Plastic Storm Sewer 4" Lateral Plastic Water Service Lateral 1-1/4" Plastic Valuation $660.00 $0.00 Permit Fees Date 03/07/2006 Plan Approval Issued By # Conn, Type 1 New 0 0 0 0 New 1 New 0 0 0 0 $150.00 0 Permit Voided I Parcelld # 1342954400 In the performance of this work, I agree to perform all work pursuant to rules 90vemlng the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party. if you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 3162 SCENIC DR AgenUOwner OSHKOSH WI 54904 - 0000 Telephone Number 379-0309 (C) To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.