HomeMy WebLinkAbout0118409-Building (basement repairs)
e
OSHKOSH
ON THE WATER
Job Address 1020 DEVONSHIRE DR
CITY OF OSHKOSH
No
118409
BUILDING PERMIT -APPLICATION AND RECORD
Owner THOMAS DITHERES HANAN
Create Date
03/07/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Ctass of Const:
Size
Unfinished/Basement ----.2 Sq. Ft. Rooms 0 Height ----.2 Ft.
Finished/Living ----.2 Sq. Ft. Bedrooms 0 Stories
Garage ----.2 Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature SFR/ LATE PERMIT/ The City of Oshkosh has not reviewed and/or approved tile design of the basement repairs. It is the contractors
of Work esponsibility for the engineering of tIlis system/repair. Abraham Construction did the repair in 2003.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: \.J11.,-......
$4.000.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Date 03/07/2006
Final/O.P.~
0 Permit Voided I
Parcelld # 1310980000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact tile easement
hoider(s) and cure any necessary approvals befor starting such activity. . a - '7 -0 b
Signature A Date 0
(
Address
OSHKOSH
WI 54902 - 6232 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.