Loading...
HomeMy WebLinkAbout0118409-Building (basement repairs) e OSHKOSH ON THE WATER Job Address 1020 DEVONSHIRE DR CITY OF OSHKOSH No 118409 BUILDING PERMIT -APPLICATION AND RECORD Owner THOMAS DITHERES HANAN Create Date 03/07/2006 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Ctass of Const: Size Unfinished/Basement ----.2 Sq. Ft. Rooms 0 Height ----.2 Ft. Finished/Living ----.2 Sq. Ft. Bedrooms 0 Stories Garage ----.2 Sq. Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature SFR/ LATE PERMIT/ The City of Oshkosh has not reviewed and/or approved tile design of the basement repairs. It is the contractors of Work esponsibility for the engineering of tIlis system/repair. Abraham Construction did the repair in 2003. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: \.J11.,-...... $4.000.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Date 03/07/2006 Final/O.P.~ 0 Permit Voided I Parcelld # 1310980000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact tile easement hoider(s) and cure any necessary approvals befor starting such activity. . a - '7 -0 b Signature A Date 0 ( Address OSHKOSH WI 54902 - 6232 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.