Loading...
HomeMy WebLinkAbout0118392 B e ÕSHKOSH ON THE WATER Job Address 860 W 19TH AVE CITY OF OSHKOSH No 118392 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS J DUNHAM Create Date Designer 03/06/2006 Contractor PORTSIDE BUilDERS, INC. Category 140 - Interior Remodelin9 Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----.2 Sq. Ft. Rooms -----.2 Height 0 Ft. Finished/Living -----.2 Sq. Ft. Bedrooms 0 Stories Garage -----.2 Sq. Ft. Baths 0 D Projection i Canopies -----.2 Signs -----.2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature ~FR/ Remodelin9 the existing kitchen, bathroom, and entry. Non-bearing wall will be removed per the plan submitted. of Work HVAC Contractor Plumbing Contractor PLUFF PLUMBING Electric Contractor ZIMMER ELECTRIC INC Fees: Valuation Issued By: ~ $45,000.00 Plan Approval $0.00 Permit Fee Paid $199.00 Park Dedication $0.00 Date 03/06/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1412770000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit a lication within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure y neces ry ov~ efore stariing such activity. AgenVOwner NEENAH Da~ -ð Co ~ 54956 - 0000 Telephone Number 920-727-4874 Signature Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.