HomeMy WebLinkAbout0118381 B
e
OSHKOSH
ON THE WATER
Job Address 1721 OAK ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118381
Owner JAMES G/SUSAN L SCHERF
Create Date
Designer
03/03/2006
Contractor
ANDERSON BROS INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
Zoning
0 Sign
0 Canopy
0 Fence
0 Raze
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
0
Height 0 Ft.
D Projection I
Canopies 0
Finished/Living
Bedrooms
Stories
Garage
~ Sq. FI.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units -----.!>
# Structures
-----.!>
Use/Nature SFRI Repairing the foundation per tI1e specifications submitted. The contractor is responsible for the design and implementation of the
of Work repairs as the City of Oshkosh does not approve and/or disapprove this installation.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: ValU
Issued By: ~
$4,160.00 Plan Approval
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Date 03/03/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1510570000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction,
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact tI1e easement
holder(s) and t necessary ap rovals before starting such activity. ~
Signature Datr ~ ~ ~
Agent/Owner
Address 2222 WHITE SWAN DR
OSHKOSH
WI 54901 - 0000
Telephone Number
920-233-4286
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.