HomeMy WebLinkAbout0118382-Building
e
OSHKOSH
ON THE WATER
Job Address 3237 BELLFIELD DR
CITY OF OSHKOSH
BUILDING PERMIT. APPLICATION AND RECORD
No
118382
Designer
Owner MARTY J/ANN M W ROBINSON
Create Date
Category
Contractor
OWNER
03/03/2006
Type
140 -Interior Remodeling
. Building
0 Sign
Plan
Zoning
0 Canopy
0 Fence
0 Raze
Class of Const:
Size
Unfinished/Basement -----2 Sq. Ft. Rooms -----2 Height -----2 Ft.
Finished/Living -----2 Sq. Ft. Bedrooms -----2 Stories
Garage -----2 Sq. Ft. Baths -----2
0 Projection I
Canopies -----2
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
Signs
-----2
0 Pier
0 Treated Wood
0 Other
Flood Plain -
# Dwelling Units ------2
Occupancy Permit
Park Dedication
Height Permit
# Structures
------2
Use/Nature ::;FRI Finishing the basement to include a rec. room, finished walk in cioset, project room/ office and a full bathroom.
of Work
HVAC Contractor
Electric Contractor
Plumbing Contractor
UNKNOWN
WITZKE ELECTRIC INC
Fees: Valuation
$6,000.00 Plan Approval
$0.00 Permit Fee Paid
Issued By:
~
$50.00 Park Dedication
Date 03/03/2006
$0.00
0 Permit Voided I
Final/O.p.~
Parcelld # 1381530000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature X ~'f\\~ C>(èf~
AgenVOwner
Date x3-3-D(;,
Address 3237 BELLFIELD DR
OSHKOSH
Wi 54904 - 0000 Telephone Number
920-819-4396
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.