HomeMy WebLinkAbout0118372-Building (repairs)
e
OSHKOSH
ON THE WATER
Job Address 44 W 11TH AVE
CITY OF OSHKOSH
No
118372
BUILDING PERMIT - APPLICATION AND RECORD
Designer
Owner CHARLES P MORTENSON
Create Date
. Building
141 - Exterior Remodeling
OWNER
03/03/2006
Category
Contractor
Type
0 Sign
Plan
Zoning
0 Canopy
0 Fence
0 Raze
Class of Const:
Size
Unfinished/Basement
---2 Sq. Ft.
---2 Sq. Ft.
Rooms ---2 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
0 Pier . Other
0 Treated Wood
Finished/Living
0 Projection J
Garage
---2 Sq. Ft.
Canopies ---2
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
Signs
0
Occupancy Permit Required
Flood Plain -
# Dwelling Units ---.Q
Park Dedication
Height Permit
Use/Nature
of Work
IRes/ RepaIrs & Renovations to correct code vioiations. Reroof, repiace misc. windows, repair wall and ceiling surfaces, replace kitchen
¡cabinets as needed, replacelrepair siding. Other misc. repairs. . Note: Victor Page is owner through past foredos ure action.
I
I
# Structures
---.Q
HVAC Contractor
Electric Contractor
Plumbing Contractor
Fees: Valuatio
$ ,000.00 Plan Approval
$0.00 Permit Fee Paid
$94.00 Park Dedication
Issued By:
Date~
$0.00
0 Permit Voided I
Final/O.p.~
Parcelld # 0302500000
Address
in the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature z.-.:- ~ "? 7.9
Agent/Owner
OSHKOSH ~ ~ - ~ Telephone Number
1020 N SAWYER ST
Date 3/-) /°'
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.