Loading...
HomeMy WebLinkAbout2006-Building 0 OSHKOSH ON THE WATER Job Address 110 N SAWYER ST CITY OF OSHKOSH No 118366 BUILDING PERMIT - APPLICATION AND RECORD Owner OSHKOSH CATHOLIC HIGH SCHOOL Create Date T Karrels 03/02/2006 Designer Contractor Category 228 - Addition Schools & other Educational GANTHER CONSTRUCTION Plan 01-66-0805 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----2 Sq. Ft. ----2 Sq. Ft. Rooms 0 Height ----2 Ft. Bedrooms ----2 Stories Baths 0 0 Projection I Finished/Living Canopies 0 Garage ----2 Sq. Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units --.Q # Structures --.Q Use/Nature f'chool/ Above grade work for green house addition as per plans AFTER THE FACT PERMIT of Work HVAC Contractor UNKNOWN??? Plumbing Contractor Electric Contractor Fees: Valuation $63.132.00 Plan Approval $0.00 Permit Fee Paid $256.00 Park Dedication Issued By: $0.00 Date 03/02/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0609630000 In the performance of this work I agree to perform all work pursuant to ruies governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 4825 CTY TRK A Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number 426-4774 To schedule inspections please call the Inspec1ion Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.