HomeMy WebLinkAbout2006-Building
0
OSHKOSH
ON THE WATER
Job Address 110 N SAWYER ST
CITY OF OSHKOSH
No
118366
BUILDING PERMIT - APPLICATION AND RECORD
Owner OSHKOSH CATHOLIC HIGH SCHOOL
Create Date
T Karrels
03/02/2006
Designer
Contractor
Category
228 - Addition Schools & other Educational
GANTHER CONSTRUCTION
Plan 01-66-0805
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
----2 Sq. Ft.
----2 Sq. Ft.
Rooms 0 Height ----2 Ft.
Bedrooms ----2 Stories
Baths 0
0 Projection I
Finished/Living
Canopies 0
Garage
----2 Sq. Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units --.Q
# Structures
--.Q
Use/Nature f'chool/ Above grade work for green house addition as per plans AFTER THE FACT PERMIT
of Work
HVAC Contractor
UNKNOWN???
Plumbing Contractor
Electric Contractor
Fees: Valuation
$63.132.00 Plan Approval
$0.00 Permit Fee Paid
$256.00 Park Dedication
Issued By:
$0.00
Date 03/02/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0609630000
In the performance of this work I agree to perform all work pursuant to ruies governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 4825 CTY TRK A
Agent/Owner
OSHKOSH
WI 54901 - 0000
Telephone Number
426-4774
To schedule inspections please call the Inspec1ion Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.