Loading...
HomeMy WebLinkAbout0118340-Building (windows) e OSHKOSH ON THE WATER Job Address 521 MERRITT AVE CITY OF OSHKOSH No 118340 BUILDING PERMIT - APPLICATION AND RECORD Owner RENEE V NELSON Create Date 03/02/2006 Designer Contractor Category 141 - Exterior Remodeling WINDOW WORLD OF MILWAUKEE Plan . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 0 Pier 0 Other 0 Treated Wood Size Type Zoning Unfinished/Basement ---.Q Sq. Ft. ---.Q Sq. Ft. 0 Projection I Finished/Living Garage ---.Q Sq. Ft. Canopies 0 Signs ---.Q Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ---2 # Structures ---2 Use/Nature SFR/ Instalaltion of 10 double hung replacement windows with exterior trim in existing openings - NO STRUCUTRAL WORK! of Work HVAC Contractor Electric Contractor Plumbing Contractor Fees: Valuation $3.150.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication Issued By: $0.00 Date 03/02/2006 Final/O,p.~ 0 Permit Voided I Parcelld # 0404210000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Agent/Owner FOND DU LAC Date Address 235 MORRIS ST ~ 54935 - 0000 Telephone Number 920-923-4189 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. f