HomeMy WebLinkAbout0118340-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 521 MERRITT AVE
CITY OF OSHKOSH
No
118340
BUILDING PERMIT - APPLICATION AND RECORD
Owner RENEE V NELSON
Create Date
03/02/2006
Designer
Contractor
Category
141 - Exterior Remodeling
WINDOW WORLD OF MILWAUKEE
Plan
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
Size
Type
Zoning
Unfinished/Basement
---.Q Sq. Ft.
---.Q Sq. Ft.
0 Projection I
Finished/Living
Garage
---.Q Sq. Ft.
Canopies 0
Signs
---.Q
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ---2
# Structures
---2
Use/Nature SFR/ Instalaltion of 10 double hung replacement windows with exterior trim in existing openings - NO STRUCUTRAL WORK!
of Work
HVAC Contractor
Electric Contractor
Plumbing Contractor
Fees: Valuation
$3.150.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
Issued By:
$0.00
Date 03/02/2006
Final/O,p.~
0 Permit Voided I
Parcelld # 0404210000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Agent/Owner
FOND DU LAC
Date
Address 235 MORRIS ST
~ 54935 - 0000 Telephone Number
920-923-4189
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
f