Loading...
HomeMy WebLinkAbout2006-Plumbing (water heater) 0 OSHKOSH ON THE WATER Job Address 935ADAMSAVE Contractor SAMMONS PLUMBING Bathtub Whirlpool Lavatory Toilet Res. Sink Bar Sink Water Heater Site Drain Roof Drain Misc. Fixtures 0 0 0 0 0 0 1 0 0 0 Shower Floor Drain Lndry Tray Disposal Dishwasher CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD No 118354 Create Date 03/02/2006 Owner TODD M/CARLA M HAIDLINGER Plan Category 411 - Residential-Water Heaters 0 ~ ~ 0 ~ 0 0 0 0 WaterSoftner Local Waste Clothes Wshr 0 0 0 0 0 0 0 0 0 Wall.SI. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink ~ ~ FlrlWst Sink 0 ~ Catch Basin 0 0 Wash Ftn 0 ~ Urinal 0 0 Standp Rec 0 ~ Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap ~ Ex! Grease Trap ~ RPZ Valve 0 Eye Wash Statn ~ Wtr Sewer Mtrs 0 Deduct Meters ~ Wtr Usage Mtrs 0 Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn REPLACE GAS WATER HEATER "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1607870200 Use/Nature ofWork Valuation Issued By $600.00 Plan Approval $0.00 Permit Fees $20.00 0 Permit Voided I Date 03/0212006 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 231-9880 Address 522 W. MURDOCK AVE AgenUOwner OSHKOSH WI 54901 - 2298 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.