Loading...
HomeMy WebLinkAbout0118339 B e OSHKOSH ON THE WATER Job Address 3300 MEDALIST DR CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 11833.9 Owner SMET INVESTMENTS LLC Create Date Designer 03/01/2006 Contractor AHERN FIRE PROTECTION Category 211 - Alteration Industrial Plan R7-17-0206 Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms --.Q Height 0 Ft. Bedrooms 0 Stories Baths 0 Zoning Size Unfinished/Basement --.Q Sq. Ft. --.Q Sq. Ft. 0 Projection I Finished/Living Canopies 0 Garage --.Q Sq. Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain ~ # Dwelling Units ----2 Height Permit Not Required Park Dedication Not Required # Structures ----2 Use/Nature IND/ Fire Sprinkler modifications for sparay booth. and wash bay as per plans. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $4,340.00 Plan Approval $0.00 Permit Fee Paid Issued By: $44.00 Park Dedication $0.00 Date 03/01/2006 Final/O.P.~ 0 Permit Voided I Parcelld # 1413650000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a partY, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 201 Morris Court Agent/Owner Fond du Lac WI 54936 - 0000 Telephone Number 920-921-9020 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ~. Ahern Fire Protection DATE: A division of ..I. F. Ahern Co. PROJECT NO.: 201 Morris Court, P.O. Box 1316. Fond du Lac. WI 54936-1316 TEL (920) 921-9020 . FAX (920) 921-8666 . www.ahemfire.com ç~ _,"""M_"'_'-"- REo TRANSMITTAL February 7, 2006 ~ SJIø 992186 G. E. ENERGY OSHKOSH, WISCONSIN TO: Building Inspector -- Brian Noe City of Oshkosh 215 Church Avenue -- PO Box 1130 Oshkosh, WI 54901 T-920/236-5051 F-9201236-1130 RËeÈ lYE D A. B. C. D. Approval or Comments Approved Approved as Noted Furnish as Corrected FEB 0 8 2006 DEPARTMENT OF COMMUNITY nFVFI OPMENT È: l1eturn Tor C-orreëhon resubmit copies For your information Refund Request For Pricing F: G: H: NO. OF COPIES STATUS DRAWING NUMBER DESCRIPTION F FP -I Automatic Fire Sprinkler System Plan F Hydraulic Calculations Permit Fee Check in the amount of $44.00 Estimated Cost of the Project: $4,340. 00 AHERN FIRE PROTECTION A division of J. F. Ahem Co. By: g)avitt ~ g)~ David W. Dewhurst, Design Manager DWDlksj cc: AI Auxier (AFP) Frank E. Henry (AFP) TCITY02.Q7-0ó.DOC ~ Ahern Fire Protection A division of J. F. Ahern Co. Wisconsin' lI1inois . Missouri' Nebraska' Iowa' Minnesota REC E lYE D FEB 0 8 2006 DEPARTMENT OF COMMUNITY DEVELOPMENT Ahern Fire Protection Division J.F. Ahern Co. 201 Morris Court Fond du Lac, WI 54936-1316 920-921-9020 Job Name Building Location System Contract Data File : GE ENERGY : SPRAY & WASH BOOTHS : 3300 MEDALIST DRIVE, OSHKOSH, WI 54902 : #2 : 992186 : 992186h.wx1 r Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Ahern -Fire Protection GE ENERGY . P¡¡ge 1, Date 020206 Hydraulic Desiqn Information Sheet Name - G.E. ENERGY Location - 3300 MEDALIST DRIVE, Building - SPRAY & WASH BOOTHS Contractor - Calculated By - A. AUXIER Construction: ( ) Combustible Occupancy - MANUDFACTURING OSHKOSH, WI 54902 Date - 020206 "'" IX) Non-Combustible System No. - #2 Contract No. - 992186 Drawing No. - FP 1 of 1 Ceiling Height - 14'6" S Y S T E M D E S I G N (X) NFPA 13 I) Lt. Haz. I ) NFPA 231 ( ) NFPA 231C Other NFPA 33 Specific Ruling Area of Density Area Per Sprinkler Elevation at Highest Outlet Hose Allowance - Inside Rack Sprinkler Allowance Hose Allowance - Outside Ord.Haz.Gp. I ) 1 ( ) 2 ( ) 3 () Ex.Haz. ( ) Figure Curve Made By Date Sprinkler Operation - BOOTHS - .40 - 78 - 14' Calculation Summary Note System Type IX) Wet ( ) Dry ( ) Deluge I ) Preaction ( ) Other Sprinkler/Nozzle Make VIKING Model MICROMATIC Size 3/4" K-Factor 8.0 Temp. Rat .165%%DF - 500 Flow Required - 960.6 Press Required - 40.312 AT SUPPLY C-Factor Used: 120 Overhead 140 Underground W A T E R S U P P L Y Water Flow Test: Date of Test - 03031992 Time of Test - UNKNOWN Static Press - 55 Residual Press - 45 Flow - 1060 Elevation - 0'0" Pump Data: Tank or Reservoir: Cap. - NA Elev.- NA ,.." Rated Cap.- NA @ Press - NA Elev. - NA Well Proof Flow NA Location - MEDALIST DRIVE Source of Information - OSHKOSH WATER DEPT. C 0 M M Commodity NA Storage Ht. NA Storage Method: Class NA Location NA Area NA Aisle W. NA Solid Piled NA Palletized NA Rack NA S T 0 R A G E R A C K ( ) Single Row ( ) Double Row I ) Mul t. Row ( ) Conven. Pallet ( ) Slave Pallet I ) Auto. Storage ( ) Solid Shelf I ) Open Shelf I ) Encap. ( ) Non Fl ue Spacing NA Longitudinal NA Clearance: Storage to Ceiling NA Transverse NA Horizontal Barriers Provided: NA -' Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Water Sur ~\,) Curve (C) Ahern Fire Protection GE ENERGY Page 2 Date 020206 150 140 130 P 120 R 110 E 100 S 90 S 80 U 70 R60 E 50 40 30 20 10 City Water Supp..!y: C1 - Static Pressure: 55 C2 - Residual Pressure: 45 C2 - Residual Flow: 1060 Demand: D1 - Elevation D2 - System Flow D2 - S~stem Pressure Hose Adj City ) Hose Demand) D3 - System Demand Safety Margin : 6.496 : 460.614 : 40.312 : ~~O5~~41 '" D "" / / - n1 200 400 600 800 1000 1200 FLOW ( N ^ 1.85) 1400 1600 1800 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Fittings Used Summary Ahern Fire Protection Page 3 GE ENERGY Date 020206 Fitting Legend Abbrev. Name % % 1 1% 1% 2 2% 3 3% 4 5 6 8 10 12 14 16 18 20 24 E 90' Standard Elbow Thrd 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 35 40 45 50 61 G Flanged Gate Valve 0 0 0 0 0 1 1 1 1 2 2 3 4 5 6 7 8 10 11 13 I 90' Grvd Firelock Elbow 0 0 0 2.1 2.6 3.5 4.3 5 0 6.8 8.5 10 13 0 0 0 0 0 0 0 J gO' Grvd Vie Firelock Tee 0 0 0 5.3 6.35 8.5 10.8 13 0 16 21 25 33 0 0 0 0 0 0 0 T 90' Flow Thru Thread Tee 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 71 81 91 101 121 V 90' Flanged Elbow 1 2 2 3 4 5 6 7 8 10 12 14 18 22 27 25 28 32 36 44 X Flanged Tee 90' Turn 3 4 5 6 8 10 12 15 17 20 25 30 35 50 60 44 51 58 65 80 <. Computer Programs by Hydratec In( .Jute 111 Windham N.H. USA 03087 ( ". Pressure I Flow Summary - STANDARD ç Ahern Fire "Protection Page 4 GE ENERGY Date 020206 (":'ode Elevation K-Fact pt Pn Flow Density Area Press 10. Actual Actual Req. DO01 15.0 8 15.43 na 31.42 0.4 77 7.0 DO02 15.0 8 14.82 na 30.8 0.4 77 7.0 0003 15.0 8 15.59 na 31.59 0.4 77 7.0 DO04 15.0 8 18.75 na 34.64 0.4 77 7.0 DO05 15.0 8 15.46 na 31.46 0.4 77 7.0 DO06 15.0 8 14.86 na 30.84 0.4 77 7.0 DO07 15.0 8 15.62 na 31.62 0.4 77 7.0 DO08 15.0 8 18.79 na 34.68 0.4 77 7.0 DO09 15.0 8 17.52 na 33.49 0.4 77 7.0 D010 15.0 8 16.89 na 32.88 0.4 77 7.0 0011 15.0 8 19.25 na 35.1 0.4 77 7.0 D012 15.0 8 17.74 na 33.69 0.4 77 7.0 D013 15.0 8 17.1 na 33.09 0.4 77 7.0 D014 15.0 8 19.49 na 35.32 0.4 77 7.0 S04 15.0 19.78 na S05 15.0 16.33 na S06 15.0 16.56 na S07 15.0 17.41 na S08 15.0 19.83 na S09 15.0 18.49 na S10 15.0 18.81 na S11 15.0 20.31 na S12 15.0 18.72 na S13 15.0 19.04 na S14 15.0 20.56 na «;01 15.0 16.29 na 02 15.0 16.52 na $03 15.0 17.37 na A01 15.0 20.27 na A02 15.0 20.31 na A03 15.0 20.76 na A04 15.0 21.01 na A05 15.0 22.06 na A06 20.66 21.35 na A07 19.16 27.42 na A08 19.16 29.86 na A09 19.16 31.07 na TOR 19.16 31.42 na BaR 0.0 39.76 na M01 0.0 39.95 na TEST 0.0 40.31 na The maximum velocity is 14.28 and it occurs in the pipe between nodes S07 and A02 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Hazen-Williams Ahern Fire Protection Page 5.. DE ENERGY Date 020206 Hyd. Qa Oia. Fitting Pipe pt pt Ref. "C" or Ftng's Pe Pv Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn ...." 0001 31.42 1.08 1E 2.305 1.000 15.428 K Factor = 8.00 to 120 0.0 2.305 0.0 801 31.42 0.2605 0.0 3.305 0.861 Vel = 11.00 0.0 31.42 16.289 K Factor = 7.79 0002 30.80 1.08 1T 5.762 1.000 14.822 K Factor = 8.00 to 120 0.0 5.762 0.0 802 30.8 0.2511 0.0 6.762 1.698 Vel = 10.79 0.0 30.80 16.520 K Factor = 7.58 0003 31.59 1.08 1T 5.762 1.000 15.588 K Factor = 8.00 to 120 0.0 5.762 0.0 803 31.59 0.2629 0.0 6.762 1.778 Vel = 11.06 0.0 31.59 17.366 K Factor = 7.58 0004 34.64 1.08 1E 2.305 1.000 18.750 K Factor = 8.00 to 120 0.0 2.305 0.0 804 34.64 0.3120 0.0 3.305 1.031 Vel = 12.13 '-' 0.0 34.64 19.781 K Factor = 7.79 0005 31.46 1.08 1E 2.305 1.000 15.464 K Factor = 8.00 to 120 0.0 2.305 0.0 805 31.46 0.2611 0.0 3.305 0.863 Vel = 11.02 0.0 31.46 16.327 K Factor = 7.79 0006 30.84 1.08 1T 5.762 1.000 14.857 K Factor = 8.00 to 120 0.0 5.762 0.0 806 30.84 0.2516 0.0 6.762 1.701 Vel = 10.80 0.0 30.84 16.558 K Factor = 7.58 0007 31.62 1.08 1T 5.762 1.000 15.624 K Factor = 8.00 to 120 0.0 5.762 0.0 807 31.62 0.2635 0.0 6.762 1.782 Vel = 11.07 0.0 31.62 17.406 K Factor = 7.58 0008 34.68 1.08 1E 2.305 1.000 18.793 K Factor = 8.00 to 120 0.0 2.305 0.0 808 34.68 0.3126 0.0 3.305 1.033 Vel = 12.15 0.0 '-ottII 34.68 19.826 K Factor = 7.79 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Standard , Ahern Fire Proteciíon Page 6 GE ENERGY Date 020206 ('Hyd. Oa Dia. Fitting Pipe pt pt Ref. "C" or Ftng's Pe Pv Notes ****** Point Ot Pf/Ft Eqv. Ln. Total Pf Pn DO09 33.49 1.08 1E 2.305 1.000 17.520 K Factor = 8.00 to 120 0.0 2.305 0.0 809 33.49 0.2932 0.0 3.305 0.969 Vel = 11.73 0.0 33.49 18.489 K Factor = 7.79 D010 32.88 1.08 1T 5.762 1.000 16.893 K Factor = 8.00 to 120 0.0 5.762 0.0 810 32.88 0.2833 0.0 6.762 1.916 Vel = 11.52 0.0 32.88 18.809 K Factor = 7.58 D011 35.10 1.08 1E 2.305 1.000 19.252 K Factor = 8.00 to 120 0.0 2.305 0.0 811 35.1 0.3195 0.0 3.305 1.056 Vel = 12.29 0.0 35.10 20.308 K Factor = 7.79 r~012 33.69 1.08 1E 2.305 1.000 17.739 K Factor = 8.00 120 0.0 2.305 0.0 812 33.69 0.2965 0.0 3.305 0.980 Vel = 11.80 0.0 33.69 18.719 K Factor = 7.79 D013 33.09 1.08 1T 5.762 1.000 17.105 K Factor = 8.00 to 120 0.0 5.762 0.0 813 33.09 0.2865 0.0 6.762 1.937 Vel = 11.59 0.0 33.09 19.042 K Factor = 7.58 D014 35.32 1.08 1E 2.305 1.000 19.490 K Factor = 8.00 to 120 0.0 2.305 0.0 814 35.32 0.3234 0.0 3.305 1.069 Vel = 12.37 0.0 35.32 20.559 K Factor = 7.79 804 34.64 1.639 1T 8.727 3.160 19.781 to 120 0.0 8.727 0.0 A01 34.64 0.0409 0.0 11.887 0.486 Vel= 5.27 0.0 34.64 20.267 K Factor = 7.69 805 31.46 1.639 0.0 6.750 16.327 to 120 0.0 0.0 0.0 rS06 31.46 0.0342 0.0 6.750 0.231 Vel= 4.78 '806 30.83 1.639 0.0 7.000 16.558 to 120 0.0 0.0 0.0 807 62.29 0.1211 0.0 7.000 0.848 Vel = 9.47 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Standard Ahern Fire Protection PQge 7~ GE ENERGY Date 020206 Hyd. Qa Dia. Fitting Pipe pt pt Ref. "C" or Ftng's Pe Pv Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn ..." 807 31.63 1.639 1T 8.727 2.500 17.406 to 120 0.0 8.727 0.0 A02 93.92 0.2589 0.0 11.227 2.907 Vel = 14.28 0.0 93.92 20.313 K Factor = 20.84 808 34.68 1.639 1T 8.727 3.160 19.826 to 120 0.0 8.727 0.0 A02 34.68 0.0410 0.0 11.887 0.487 Vel= 5.27 0.0 34.68 20.313 K Factor = 7.69 809 33.49 1.639 0.0 8.330 18.489 to 120 0.0 0.0 0.0 810 33.49 0.0384 0.0 8.330 0.320 Vel = 5.09 810 32.88 1.639 1T 8.727 5.580 18.809 to 120 0.0 8.727 0.0 A03 66.37 0.1362 0.0 14.307 1.949 Vel = 10.09 0.0 66.37 20.758 K Factor = 14.57 ....., 811 35.10 1.639 1T 8.727 2.000 20.308 to 120 0.0 8.727 0.0 A03 35.1 0.0420 0.0 10.727 0.450 Vel= 5.34 0.0 35.10 20.758 K Factor = 7.70 812 33.69 1.639 0.0 8.330 18.719 to 120 0.0 0.0 0.0 813 33.69 0.0388 0.0 8.330 0.323 Vel= 5.12 813 33.09 1.639 1T 8.727 5.580 19.042 to 120 0.0 8.727 0.0 A04 66.78 0.1378 0.0 14.307 1.972 Vel = 10.15 0.0 66.78 21.014 K Factor = 14.57 814 35.32 1.639 1T 8.727 2.000 20.559 to 120 0.0 8.727 0.0 A04 35.32 0.0424 0.0 10.727 0.455 Vel= 5.37 0.0 35.32 21.014 K Factor = 7.70 801 31.42 1.639 0.0 6.750 16.289 to 120 0.0 0.0 0.0 802 31.42 0.0342 0.0 6.750 0.231 Vel = 4.78 '*" 802 30.80 1.639 0.0 7.000 16.520 to 120 0.0 0.0 0.0 803 62.22 0.1209 0.0 7.000 0.846 Vel = 9.46 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Standard t Ahern Fire Prbtecfion Page 8 GE ENERGY Date 020206 f'\ Hyd. Qa Dia. Fitting Pipe pt pt Ref. "C" or Ftng's Pe Pv Notes ****** Point Qt Pf/Ft Eqv. Ln. Total Pf Pn S03 31.59 1.639 1T 8.727 2.500 17.366 to 120 0.0 8.727 0.0 A01 93.81 0.2584 0.0 11.227 2.901 Vel = 14.27 A01 34.64 4.31 0.0 11.000 20.267 to 120 0.0 0.0 0.0 A02 128.45 0.0042 0.0 11.000 0.046 Vel= 2.82 A02 128.60 4.31 21 18.954 10.620 20.313 to 120 0.0 18.954 0.0 A03 257.05 0.0150 0.0 29.574 0.445 Vel= 5.65 A03 101.47 4.31 0.0 9.200 20.758 to 120 0.0 0.0 0.0 A04 358.52 0.0278 0.0 9.200 0.256 Vel= 7.88 A04 102.09 4.31 21 18.954 4.660 21.014 to 120 0.0 18.954 0.0 A05 460.61 0.0443 0.0 23.614 1.045 Vel = 10.13 A05 0.0 4.31 31 28.431 10.950 22.059 (') 120 0.0 28.431 -2.451 A06 460.61 0.0442 0.0 39.381 1.742 Vel = 10.13 A06 0.0 4.31 31 28.431 71.660 21.350 to 120 1J 22.299 50.730 0.650 A07 460.61 0.0443 0.0 122.390 5.416 Vel = 10.13 A07 0.0 4.26 0.0 52.250 27.416 to 120 0.0 0.0 0.0 A08 460.61 0.0468 0.0 52.250 2.447 Vel = 10.37 A08 0.0 6.065 2E 28.0 116.000 29.863 to 120 0.0 28.000 0.0 A09 460.61 0.0084 0.0 144.000 1.207 Vel= 5.12 A09 0.0 7.981 2E 36.0 122.540 31.070 to 120 0.0 36.000 0.0 TOR 460.61 0.0022 0.0 158.540 0.350 Vel= 2.95 TOR 0.0 7.981 0.0 17.750 31.420 to 120 0.0 0.0 8.298 BOR 460.61 0.0022 0.0 17.750 0.039 Vel= 2.95 BOR 0.0 8.39 1V 30.537 52.290 39.757 to 140 1X 59.377 96.700 0.0 M01 460.61 0.0013 1G 6.786 148.990 0.193 Vel= 2.67 M01 0.0 8.39 1V 30.537 181.830 39.950 to 140 1X 59.377 96.700 0.0 (rEST 460.61 0.0013 1G 6.786 278.530 0.362 Vel= 2.67 0.0 Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087 Final Calculations - Standard Ahern Fire Protection GE ENERGY Page ~ Date 020206 Hyd. Ref. Point Qa Dia. "C" Pf/Ft Fitting or Eqv. Ln. Pipe Ftng's Total pt Pe Pf pt Pv Pn Notes ******...., Qt 460.61 40.312 K Factor = 72.55 "-' 'wIÌ Computer Programs by Hydratec Inc. Route 111 Windham N.H. USA 03087