HomeMy WebLinkAbout0118325-Building (kitchen remodel)
e
OSHKOSH
ON THE WATER
Job Address 2030 HAZEL ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
Owner MR/MRS THOMAS 0 HALLQUIST
Create Date
03/01/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy Q Fenoe 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
0 Pier 0 Other
0 Trealed Wood
Zoning
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
0 Projection I
Canopies ~
Finished/Living
Garage
~Sq.Ft.
Signs
~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
Occupancy Permit
Flood Plain -
# Dwelling Units ~
Height Permit
Park Dedication
# Structures
~
Use/Nature SFRi Replacing the kitchen cabinets and countertops and replacing floor coverings.
ofWork
HVAC Contractor
Plumbing Contractor
KOCH PLUMBING
Electric Contractor
Fees: Valuation
$6,000.00 Plan Approval
$0.00 Permit Fee Paid
$50.00 Park Dedication
$0.00
Issued By:
~
Date 03/01/2006
Flnal/O.p.~
0 Permit Voided I
Parcelld # 1521330000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application with"in ~n easement,',th,e City strongly urges the permit applicant to contact the easement /
holder(s) and to s:~,~re anr.-'2;'c'~/~;t>~v,a, Is"be!."r~.~ctIf¡g such activity. h
Signature"?<.///--' /./- ?/-::;;:?,;?.....-- Dat"j- 3// t;:J b
' p' /~ <. Agent/Owner / ,
Address 2030 HAZEL ST
OSHKOSH
WI 54901 - 2447
Telephone Number
235-1330
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.