HomeMy WebLinkAbout0118332-Building (siding & porches)
e
OSHKOSH
ON THE WATER
Job Address 2405 DOTY ST
CITY OF OSHKOSH
No
118332
BUILDING PERMIT - APPLICATION AND RECORD
Owner BERNIE LLC
Create Date
03/01/2006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height ~ Ft.
FinishedfLiving ~Sq.Ft. Bedrooms ~ Stories
Garage ~ Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain -
# Dwelling Units ~
Height Permit
Park Dedication
# Structures
~
Use/Nature
ofWork
FRI Replacing siding and the deteriorated porches. The porches will be rebuilt to the same original size all loads shall be properly
ranseferred to the foundation. The new owner is Greg and Sue Courter.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Issued By:
$22,000.00 Plan Approval
~
$0.00 Permit Fee Paid
$130.00 Park Dedication
$0.00
Fees: Valuation
Date 03/01/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1413370300
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perform the work
described in this permit app ication within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secur necessary approv Is befOr~lng such activity. I.
Signature y:: . ~ Date X 3/;/"'"
AgenUOwner r
OSHKOSH
~ 54902 - 0000 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.