Loading...
HomeMy WebLinkAbout0118332-Building (siding & porches) e OSHKOSH ON THE WATER Job Address 2405 DOTY ST CITY OF OSHKOSH No 118332 BUILDING PERMIT - APPLICATION AND RECORD Owner BERNIE LLC Create Date 03/01/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height ~ Ft. FinishedfLiving ~Sq.Ft. Bedrooms ~ Stories Garage ~ Sq. Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain - # Dwelling Units ~ Height Permit Park Dedication # Structures ~ Use/Nature ofWork FRI Replacing siding and the deteriorated porches. The porches will be rebuilt to the same original size all loads shall be properly ranseferred to the foundation. The new owner is Greg and Sue Courter. HVAC Contractor Plumbing Contractor Electric Contractor Issued By: $22,000.00 Plan Approval ~ $0.00 Permit Fee Paid $130.00 Park Dedication $0.00 Fees: Valuation Date 03/01/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1413370300 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perform the work described in this permit app ication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secur necessary approv Is befOr~lng such activity. I. Signature y:: . ~ Date X 3/;/"'" AgenUOwner r OSHKOSH ~ 54902 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.