Loading...
HomeMy WebLinkAbout2006-Plumbing G OSHKOSH ON THE WATER Job Address 515 S WASHBURN ST CITY OF OSHKOSH No 118316 PLUMBING PERMIT - APPLICATION AND RECORD Owner COMPASS PROPERTIES LLC Plan Create Date 02/28/2006 Category 440 - Industrial-Interior Contractor M P KELLY Bathtub 0 Shower 0 Water softner 0 Waitst 0 Shamp Sink 0 Coffee Maker 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0 Lavatory 1 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ex! Grease Trap 0 Toilet 1 Disposal 0 Bidet 0 sculry Sink 0 Wash Ftn 0 RPZValve 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink ---.2 Urinal 0 Eye Wash Statn 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 standp Rec 0 Wtr Sewer Mtrs 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature INSTALL ADA LAV AND WATER CLOSET "CHECK #7587 of Work Size Material Sanitary Sewer Storm Sewer Water Service Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $20.00 0 Permit Voided I Parcelld # 0614620000 $0.00 Permit Fees Valuation $1,500.00 Plan Approval Issued By Date 02128/2006 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 665 N MAIN ST AgenUOwner OSHKOSH Telephone Number 231-1750 WI 54901 - 4431 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.