HomeMy WebLinkAbout0118323-Building
e
OSHKOSH
ON THE WATER
Job Address 517 MONROE ST
CITY OF OSHKOSH
BUILDING PERMIT. APPLICATION AND RECORD
No
118323
Owner LEE J TRITT
Category
Contractor
Create Date
Zoning
. Building
140 -Interior Remodeling
OWNER
02/28/2006
Designer
Type
Plan
0 Sign
0 Canopy
Q Fence
0 Raze
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height ~ Ft.
Finished/Living ~Sq.Ft. Bedrooms ~ Stories
Garage ~Sq.Ft. Baths ~
0 Projection I
Canopies ~
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Signs
~
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain -
# Dwelling Units ------.Q
Height Permit
Park Dedication
# Structures
------.Q
Use/Nature
ofWork
~~~~~%G~~~~~:~ ~~t" fl~~~ ~~~~il~h~:~~~'~~~i~~d O~~:;'i~~~ ~~~~n~; t~~a~ r~~~~~:t~~~~;~e".;~e~~c~~~e~t:~~~~~:;~nits.
Seperate pennits wiii be required for plumbing and electrical work.
I I
HVAC Contractor
Electric Contractor
Plumbing Contractor
SOLAR ELECTRIC SERVICES INC
KOCH PLUMBING
Fees: Valuation
$8.000.00 Plan Approval
$0.00 Permit Fee Paid
Issued By: 4
$62.00 Park Dedication
Date~
$0.00
Final/O.p.~
0 Permit Voided I
Parcelld # 0404710000
In the performance of this work I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this pennit application within an easement. the City strongly urges the pennit applicant to contact the easement
holder(s) and to Secure any necessaty approvals before starting such activity.
Signature ~ "-:;;"';::'fi'¿:"...?.,::7>~;7#^-'-"--""
/" - AgenVOwner
Date '<" zÆ 9Æ.b
Address 270 SUNNYBROOK DR
OSHKOSH
WI 54904 - 0000 Telephone Number
To schedule inspections please call the InspectionRequest line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.