Loading...
HomeMy WebLinkAbout0118321-Building (remodel basement) ~ OSHKOSH ON THE WATER Job Address 3275 CASEY TRL CITY OF OSHKOSH BUILDING PERMIT -APPLICATION AND RECORD No 118321 OWner CHET WESENBERG Create Date 02/28/2006 Designer Contractor CHET WESENBERG ARCHITECHT LLC Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~ Sq. Ft. Baths ~ D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature SFRI Finishing the basement to include a family room, hallway, and two unfinished areas. All construction to comply with minimum of Work building code requirements. Seperate mechanical and fire place penmits are required. HVAC Contractor Ptumbing Contractor Electric Contractor Fees: Valuation $7,000.00 Plan Approval $0.00 Penmit Fee Paid $56.00 Park Dedication $0.00 Issued By: Date 02/28/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # Not Assign In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 3162 HAYWARD AVE Agent/Owner OSHKOSH WI 54904 - 0000 Telephone Number 920-230-4900 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.