HomeMy WebLinkAbout0118317-Plumbing (sump pump)
e
OSHKOSH
ON THE WATER
Job Address 2690 BADGER AVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
118317
Owner OSHKOSH WAREHOUSE LLC
Create Date 0212812006
Contractor M P KELLY
Category 440 - Industrial-Interior
Plan
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater 0
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
UselNature
ofWork
Valuation
Issued By
Shower
Floor Drain
0
0
0
0
0
1
0
0
0
Water softner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
WaitSt.
Ice Chest
Exam Sink
sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
serv Sink
0
0
0
0
0
0
0
0
0
Shamp Sink ~
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
standp Rec ~
Ice Maker 0
Gar Drain 0
Soda Disp ~
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap 0
RPZ Valve 0
Eye Wash statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Sterilizer
Dip Well
Drink Ftn
0
0
0
0
0
0
0
0
0
Breakrm Sink
Ejector/Grind
REPLACE SUMP PUMP AT 2450 OAKWOOD RD "CHECK #7587
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1329100101
$571.00
Plan Approval
$0.00
$20.00 D Permit Voided I
Permit Fees
Date 02128/2006
In the performance of this work. I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Address 665 N MAIN ST
Signature
Date
AgenVOwner
OSHKOSH
WI 54901 - 4431
Telephone Number 231-1750
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.