HomeMy WebLinkAbout0118322 B
e
OSHKOSH
ON THE WATER
Job Address 831 W 7TH AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
118322
Owner SUSAN E BOUSHELE
Create Date
02128/2006
Designer
Contractor
SURE-DRY-BASEMENT SYSTEMS INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
a Sign
a Canopy
0 Fence
a Raze
Zoning
Class of Canst:
Size
Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories
Garage ----2 Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete a Floating Siab
a Concrete Block a Post
a Pier
a Treated Wood
a Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
-----2
Use/Nature
ofWork
FRI/ instaiiing Grip Tite wail anchors to repair the South and East foundation wails.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Issued By:
Fees: Valuation $7,990.00
C\j
Plan Approval
$0.00 Permit Fee Paid
$62.00 Park Dedication
$0.00
Date 02128/2006
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 0605480000
In the performance of this work i agree to perform ail work pursuant to ruies governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
hoider(s) and to secure ny necessary approvais before starting such activity.
Signature!þ-, ~
AgenUOwner
MENASHA
Date ~ 2/2-(1 /O~
Address 754 W AiRPORT RD
WI 54952 - 1409
Telephone Number
920-967-9655
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.