Loading...
HomeMy WebLinkAbout0118322 B e OSHKOSH ON THE WATER Job Address 831 W 7TH AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118322 Owner SUSAN E BOUSHELE Create Date 02128/2006 Designer Contractor SURE-DRY-BASEMENT SYSTEMS INC Category 141 - Exterior Remodeling Plan Type . Building a Sign a Canopy 0 Fence a Raze Zoning Class of Canst: Size Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories Garage ----2 Sq. Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete a Floating Siab a Concrete Block a Post a Pier a Treated Wood a Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures -----2 Use/Nature ofWork FRI/ instaiiing Grip Tite wail anchors to repair the South and East foundation wails. HVAC Contractor Plumbing Contractor Electric Contractor Issued By: Fees: Valuation $7,990.00 C\j Plan Approval $0.00 Permit Fee Paid $62.00 Park Dedication $0.00 Date 02128/2006 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 0605480000 In the performance of this work i agree to perform ail work pursuant to ruies governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the permit applicant to contact the easement hoider(s) and to secure ny necessary approvais before starting such activity. Signature!þ-, ~ AgenUOwner MENASHA Date ~ 2/2-(1 /O~ Address 754 W AiRPORT RD WI 54952 - 1409 Telephone Number 920-967-9655 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.