Loading...
HomeMy WebLinkAbout0118305-Building (Remodel prep) e OSHKOSH ON THE WATER Job Address 2211 OREGON ST CITY OF OSHKOSH No 118305 BUILDING PERMIT. APPLICATION AND RECORD Owner COYOTE OF WISCONSIN LLC Create Date 02127/2006 Designer Contractor LAKEVIEW CARETAKERS Category 232 - Alteration Stores & Customer Service Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class 01 Const: Size Unfinished/Basement ~Sq,Ft. ~Sq.Ft. Rooms Height 0 Ft. D Projection i Canopies 0 Finished/Living Bedrooms 0 Stories Garage ~Sq.Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Not Required # Dwelling Units ~ # Structures ~ Park Dedication Use/Nature 211 "E" - Demolition in preparation lorluture tenant space remodel -ALL FIRE WALLS TO REMAIN IN PLACE -All electricai to be 01 Work properly abandon by licensed eiectrician prior to demolition. NO STRUCTURAL MODIFICATIONS! HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation 00.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Issued By: Date 02127/2006 Final/O,P. 00/00/0000 D Permit Voided i Parcelld # 1410280000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement :~~~~:::~::;~fore starting such activity. Date ,;; - 3-7- <::> 6 AgenVOwner Address N4229 LAKEViEW SR MARKESAN WI 53946 - 0000 Telephone Number 920-294-0861 To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.