HomeMy WebLinkAbout0118305-Building (Remodel prep)
e
OSHKOSH
ON THE WATER
Job Address 2211 OREGON ST
CITY OF OSHKOSH
No
118305
BUILDING PERMIT. APPLICATION AND RECORD
Owner COYOTE OF WISCONSIN LLC
Create Date
02127/2006
Designer
Contractor
LAKEVIEW CARETAKERS
Category
232 - Alteration Stores & Customer Service
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class 01 Const:
Size
Unfinished/Basement
~Sq,Ft.
~Sq.Ft.
Rooms
Height
0 Ft.
D Projection i
Canopies 0
Finished/Living
Bedrooms 0
Stories
Garage
~Sq.Ft.
Baths
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Not Required
# Dwelling Units ~
# Structures
~
Park Dedication
Use/Nature 211 "E" - Demolition in preparation lorluture tenant space remodel -ALL FIRE WALLS TO REMAIN IN PLACE -All electricai to be
01 Work properly abandon by licensed eiectrician prior to demolition. NO STRUCTURAL MODIFICATIONS!
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
00.00 Plan Approval
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Issued By:
Date 02127/2006
Final/O,P. 00/00/0000
D Permit Voided i
Parcelld # 1410280000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
:~~~~:::~::;~fore starting such activity. Date ,;; - 3-7- <::> 6
AgenVOwner
Address N4229 LAKEViEW SR
MARKESAN
WI 53946 - 0000
Telephone Number
920-294-0861
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.