HomeMy WebLinkAbout0118302-Building (porch repairs)
e
OSHKOSH
ON THE WATER
Job Address 1617MINNESOTAST
CITY OF OSHKOSH
No
118302
BUILDING PERMIT - APPLICATION AND RECORD
Owner J & G RENTAL LLC
Create Date
02/27/2006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~ Sq. Ft. Rooms
Finished/Living ~ Sq. Ft. Bedrooms
Garage ~ Sq. Ft. Baths
Height
Oft.
D~o~~
Canopies ~
Stories
Signs
0
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature RENTAU LATE PERMIT! Repairing the guardrails. handrails. and steps for the front porch. Repairs are to be completed and inspected
of Work by June 1, 2006.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Val.uat~n,-
Issued BY:~
$500.00 Plan Approval
$0.00 Penmit Fee Paid
$20.00 Park Dedication
$0.00
Date 02/27/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0908220000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh h1s no authority to force easement restrictions of which it is not a party. if you perform the work
described in this permit applièation within a e ement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any n~cessary a pr .1 befo d starting such activity.
Signature ~
Date yo..3f ;; 7/ Ow
OSHKOSH
~ 54904 - 8334 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.