Loading...
HomeMy WebLinkAbout0118288 B e OSHKOSH ON THE WATER Job Address 2025 N MAIN ST CITY OF OSHKOSH No 118288 BUILDING PERMIT - APPLICATION AND RECORD Owner WilLIAM AISHARO LAPOINTE SR Create Date 02/23/2006 Designer Contractor lEAD-SAFE SERVICES INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ------.2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ------.2 Sq. Ft. Bedrooms Stories Garage ------.2 Sq. Ft. Baths 0 D Projection I Canopies ------.2 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units -----9. # Structures 0 Park Dedication Use/Nature SFR/ Installing 13 replacement windows (same size and location) and installing vinyl siding on the garage. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: val~ Issued By: $6.500.00 Plan Approval $0.00 Permit Fee Paid $56.00 Park Dedication $0.00 Date 02123/2006 Final/O.P. 00/00/0000 D Permit Voided i Parcelld # 1514930000 in the performance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to sure any nece ry provals before starting such activity. Date é2'3:?-ðb AgenUOwner LARSEN WI 54947 - 3513 Telephone Number 850-5043 Signature Address 3905 COUNTY RD II #36 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.