HomeMy WebLinkAbout0118288 B
e
OSHKOSH
ON THE WATER
Job Address 2025 N MAIN ST
CITY OF OSHKOSH
No
118288
BUILDING PERMIT - APPLICATION AND RECORD
Owner WilLIAM AISHARO LAPOINTE SR
Create Date
02/23/2006
Designer
Contractor
lEAD-SAFE SERVICES INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ------.2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ------.2 Sq. Ft. Bedrooms Stories
Garage ------.2 Sq. Ft. Baths 0
D Projection I
Canopies ------.2
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units -----9.
# Structures
0
Park Dedication
Use/Nature SFR/ Installing 13 replacement windows (same size and location) and installing vinyl siding on the garage.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: val~
Issued By:
$6.500.00 Plan Approval
$0.00 Permit Fee Paid
$56.00 Park Dedication
$0.00
Date 02123/2006
Final/O.P. 00/00/0000
D Permit Voided i
Parcelld # 1514930000
in the performance of this work I agree to perform ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to sure any nece ry provals before starting such activity.
Date é2'3:?-ðb
AgenUOwner
LARSEN
WI 54947 - 3513
Telephone Number
850-5043
Signature
Address 3905 COUNTY RD II #36
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.