Loading...
HomeMy WebLinkAbout0118273-Building (osb; drainage; flashing) e OSHKOSH ON THE WATER Job Address 649 W 9TH AVE CITY OF OSHKOSH BUILDING PERMIT. APPLICATION AND RECORD No 118273 Owner CHASE MANHATTAN MORTGAGE CORP Create Date 02/23/2006 Designer Contractor AAA PLUS CONSTRUCTION LLC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~sq.Ft. Rooms Finished/Living ~sq.Ft. Bedrooms Garage ~Sq.Ft. Baths Height 0 Ft. 0 Proje~ Canopies Stories Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature SFR/ Replacing the osb sheathing on the rear of the dwelling, installing house wrap as a drainage plane, flashing the windows, and of Work re-installing the siding, HVAC Contractor Plumbing Contractor Electric Contractor Fees: valuati,o) Issued By: \ ~ $1,500.00 Plan Approval $0,00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 02/23/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcel Id # 1303610000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ce ry approv~efore starting such activity. Signature r&:Z- Date AgenUOwner Cp ONEIDA WI 54155 - 0000 Telephone Number 920-360-9431 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not peñormed within two business days from the time the project is ready.