HomeMy WebLinkAbout0118273-Building (osb; drainage; flashing)
e
OSHKOSH
ON THE WATER
Job Address 649 W 9TH AVE
CITY OF OSHKOSH
BUILDING PERMIT. APPLICATION AND RECORD
No
118273
Owner CHASE MANHATTAN MORTGAGE CORP
Create Date
02/23/2006
Designer
Contractor
AAA PLUS CONSTRUCTION LLC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~sq.Ft. Rooms
Finished/Living ~sq.Ft. Bedrooms
Garage ~Sq.Ft. Baths
Height
0 Ft.
0 Proje~
Canopies
Stories
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature SFR/ Replacing the osb sheathing on the rear of the dwelling, installing house wrap as a drainage plane, flashing the windows, and
of Work re-installing the siding,
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: valuati,o)
Issued By: \ ~
$1,500.00 Plan Approval
$0,00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Date 02/23/2006
Final/O.P. 00/00/0000
D Permit Voided I
Parcel Id # 1303610000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure ce ry approv~efore starting such activity.
Signature r&:Z- Date
AgenUOwner
Cp
ONEIDA
WI 54155 - 0000 Telephone Number
920-360-9431
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not peñormed within two business days from the time the project is ready.