HomeMy WebLinkAbout0118199-Building
e
OSHKOSH
ON THE WATER
Job Address 846 W 10TH AVE
CITY OF OSHKOSH
No
118199
BUILDING PERMIT. APPLICATION AND RECORD
Owner DEUTSCHE BANK NATIONAL TRUST CO
Create Date
02/14/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement ~Sq.Ft. Rooms Height 0 Fl
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
0 Projection I
Canopies
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Penmit
Park Dedication
Flood Plain
Height Permit
# Dwelling Units ~
# Structures
~
Use/Nature FRI Covering existing wails with new drywail. Converting 2 bedrooms to 1 on the 2nd floor and adding a closet. Any wails that are
of Work 'opened" will need to be updated for electric and structural work. The new owner is Dennis Schwab.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$20,000.00 Plan Approval
$0.00 Permit Fee Paid
$124.00 Park Dedication
$0.00
Issued By:
Date 02114/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1302670000
in the performance of this work I agree to perform ail work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
- - <!esgiþ-,,-dJ.nJ!1i.s_Perm itapplication within. an. easement,the Coy. strongly- urges the permit-applicant-to-contac!-the-easement---
hoider(s) and to secure any necessary approvals before starting such activOy.
Signature
Date
Address 400 COUNTRYWIDE WAY
Agent/Owner
SIMI VALLEY
CA 93065 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc,), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.