HomeMy WebLinkAbout0118263 B
e
OSHKOSH
ON THE WATER
Job Address 346 W 17TH AVE
CITY OF OSHKOSH
No
118263
BUILDING PERMIT - APPLICATION AND RECORD
Owner DAVID J/ C I RICHARDS
Create Date
02/22/2006
Designer
Contractor
HICKEY ROOFING
Category
141 - Exterior Remodeling
Plan
Type
.B..LJiI.~\L
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
----2 Sq. Ft.
----2 Sq. Ft.
Rooms
Height 0 Ft.
D Projection I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Garage
----2 Sq. Ft.
Baths
0
Signs
----2
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Not Required
# Dwelling Units ~
# Structures
~
Park Dedication
Use/Nature
ofWork
FR/ Tear-off roofing, install new roofing - NO STRUCTURAL WORK
HVAC Contractor
Plumbing Contractor
Electric Contractor
$3,713.00 Plan Approval
$0.00 Permit Fee Paid
$38.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 02/22/2006
Final/O.P. 00/00/0000
D Permit Voided i
Parcelld # 0908550000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address
1427 BROAD ST
AgenUOwner
OSHKOSH
WI 54901 - 0000
Telephone Number
426-4008
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.