Loading...
HomeMy WebLinkAbout0118263 B e OSHKOSH ON THE WATER Job Address 346 W 17TH AVE CITY OF OSHKOSH No 118263 BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID J/ C I RICHARDS Create Date 02/22/2006 Designer Contractor HICKEY ROOFING Category 141 - Exterior Remodeling Plan Type .B..LJiI.~\L 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----2 Sq. Ft. ----2 Sq. Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms 0 Stories Canopies 0 Garage ----2 Sq. Ft. Baths 0 Signs ----2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Not Required # Dwelling Units ~ # Structures ~ Park Dedication Use/Nature ofWork FR/ Tear-off roofing, install new roofing - NO STRUCTURAL WORK HVAC Contractor Plumbing Contractor Electric Contractor $3,713.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 02/22/2006 Final/O.P. 00/00/0000 D Permit Voided i Parcelld # 0908550000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1427 BROAD ST AgenUOwner OSHKOSH WI 54901 - 0000 Telephone Number 426-4008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.