HomeMy WebLinkAbout0118254-Building
e
OSHKOSH
ON THE WATER
Job Address 1214 SPRUCE ST
CITY OF OSHKOSH
No
118254
BUILDING PERMIT - APPLICATION AND RECORD
Owner GORDON E/B SUSA MAXWELL
Create Date
02/21/2006
Designer
Contractor
JIM BAUER CARPENTRY AND CONSTRUCTIO
Category
140 -Interior Remodeling
Plan
Type
. Buiiding
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq,Ft,
Rooms
Height
OFt.
0 Projection I
Canopies 0
Finished/Living
Bedrooms
Stories
Garage
~Sq.Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Pennit
Flood Plain ~
# Dwelling Units ~
Height Permit
Park Dedication
# Structures
~
Use/Nature SFR/ Finishing a room In the office to be used as an office, Finished ceiling height shall be a minimum of 1'-0" and any projections shall
of Work rot be lower then 6'-4".
HVAC Contractor
Plumbing Contractor
Electric Contractor
SLIM'S ELECTRiC INC
Fees: Valuation $2,600,00
Issued By: ~
Plan Approval
$0,00 Permit Fee Paid
$32,00 Park Dedication
$0.00
Date 02/21/2006
Final/O,P. 00/00/0000
0 Permit Voided I
Parcelld # 1205940000
In the performance of this work I agree to perform all work pursuant to nules governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within a sement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary a rov Is before ta 'ng s h activity.
DateK" ri-¡J. /--Dr:.
Signature
Address 6825 FRONTIER RD
""'I.. 54986 - 0000 Telephone Number
920-582-7740
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.