Loading...
HomeMy WebLinkAbout0118232-Plumbing (toilet) e OSHKOSH ON THE WATER Job Address 1930 SIMPSON ST Contractor J RASMUSSEN PLUMBING INC Bathtub ~ Whirlpool 0 Lavatory 0 Toilet 1 Res. Sink 0 Bar Sink 0 Water Heater 0 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Valuation $200.00 Plan Approval Issued By CITY OF OSHKOSH No 118232 PLUMBING PERMIT - APPLICATION AND RECORD Agent/Owner OSHKOSH Owner LUCILLE E MILLER Create Date 02/20/2006 REPLACE TOILET IN BASEMENT "DEBIT ACCT Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1409700000 ~ ~ 0 0 0 0 0 0 0 WaterSoftner Local Waste Clothes Wshr Category 410- Residential-Interior Plan Bidet Beer Tap Lab Sink Sterilizer DipWeli Drink Ftn $0.00 0 0 0 0 0 0 0 0 0 " 0 0 0 0 ~ 0 ~ 0 Wai!.S!. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink ~ 0 FlrlWst Sink 0 ~ Catch Basin 0 0 Wash Ftn 0 ~ Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker Int Grease Trap Ext Grease Trap RPZ Valve Eye Wash Statn WtrSewerMtrs Deduct Meters Wtr Usage Mtrs Permit Fees $20.00 D Permit Voided I Date 02/20/2006 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the èasemerll holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1914 GREENBRiAR TRL WI 54904 - 0000 Telephone Number 920-233-6747 To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. ---r----