HomeMy WebLinkAbout0118233-Building
~
OSHKOSH
ON THE WATER
Job Address 848 FREDERICK ST
CITY OF OSHKOSH
No
118233
BUILDING PERMIT - APPLICATION AND RECORD
Owner MARY L REICHENBERGER
Create Date
02120/2006
Designer
Contractor
LARRY'S FINISH CARPENTRY
Category
140 - Interior Remodeling
Plan
---~
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
~
Zoning
Class of Const:
Size
-~
Unfinished/Basement ----2 Sq. Ft. Rooms
Finished/Living ----2 Sq. Ft. Bedrooms
Garage ----2 Sq. Ft. Baths
Height
0 Ft.
D Projection!
Stories
Canopies 0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
--
---
Park Dedication
---
# Dwelling Units 0
# Structures
0
Use/Nature rFRf "Gutting" the kitchen, 2nd floor bathroom and bedroom. Updating wall and ceiling framing, re-drywalling. Any plumbing and
of Work electric updates shall not be done until seperate permits are obtained.
HVAC Contractor
Plumbing Contractor
Electric Contractor
$18,000.00 Plan Approval
$0.00 Permit Fee Paid
$114.00 Park Dedication
Fees: Valuation
$0.00
Issued By:
~
Date 02/20/2006
FinaI/O.P. OO/OO/OOO~
D Permit Voided j
Parcel Id # 1005720000
In the perfomnance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this per' application within an easement, the City strongly urges the pemnit applicant to contact the easement
holder(s) and to se r any necessary approva re starting such activity. ;;./
Signature Date J< '70/D~
Oshkosh
- ~ ~~~ - QQ~ Telephone Number
236-2598
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.