Loading...
HomeMy WebLinkAbout0118240-HVAC (furance & a/c) ~ OSHKOSH ON THE WATER Job Address 417 W 14TH AVE CITY OF OSHKOSH No 118240 HVAC PERMIT - APPLICATION AND RECORD Owner LISA D MARTIN Create Date 02/13/2006 Plan Contractor MARTENS HEATING & COOLING I Oil Fuel ~ Gas System n New I ~ Forced Air U Radiant U Electric I Hot Water Chimney Type 0 ChimneyA () Chimney B Heat Loss () As Approved . Existing BTU Rate D As Per Plan . Variable Category 502 - Residential-Both !:lElectric ~.--.J U Solid 0 Other ~ AlC I U Vent I Con. Burner I ( ) Not Applicable [71 Replace USteam U Suppl. . Direct Vent ( ) Not Applicable 0 Other --.J Value Value Use/Nature SFRI Replace furnace and AlC - EIV provided by Hoehne Elect - NO chimney Liner being installed --Where an appliance is permanently of Work isconnected from an existing chimney or vent (CN). the CN shall be resized as necessary to control flue gas condensation in the interior of the CN and to provide the appliance or appliances served with the req. draft. Fees: Valuation $4.539.60 Plan Approval $0.00 Permit Fee Paid $74.00 Issued By: Date 02120/2006 0 Permit Voided I Pareelld # 0907330000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement, the City strongly urges the penmitapplicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenVOwner Address PO BOX 106 WAUKAU Wi 54980 -106 Telephone Number 920-685-0111 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.