Loading...
HomeMy WebLinkAbout0118219-Building -e OSHKOSH ON THE WATER Job Address 861 W SOUTH PARK AVE CITY OF OSHKOSH No 118219 BUILDING PERMIT - APPLICATION AND RECORD Owner CHRISTINE A DRESCHER Create Date 02/17/2006 Designer Contractor DAN V BINDER CONSTRUCTION Category 140 -Interior Remodeling Plan Type . Building __O_Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths D Projection I Canopies Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/ Hemodeling the first floor bathroom. The only new fixture will be the sink. Installing new cabinets/bookcases and electrical in the ofWork basement. HVAC Contractor Plumbing Contractor UNKNOWN Electric Contractor UNKNOWN???? Fees: Val~ati~n Issued By: ~lf-- $2,000.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 02/17/2006 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1305040000 In the performance of this work I agree to perfonn all work pursuant to nules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the eas~me . hoider(s) and to sure necessa approvals before starting such activity. ) ",' {} ~- ~ ~lð AgenVOwner Address 61 W SOUTH PARK AVE OSHKOSH WI 54902 - 6378 Telephone Number To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. 15& [ ,<5oLf-\1\Pari-ž- A\k f "c..knl? >t ~=KNìdc Url-e5 '2b\ ~"'Z.Z.- '1~ "VlA~"'b - UJ\LJ 4-Ù\o 'Ú-~ - ~ C7U. 0 b-r- ¡;;+, t '5+- r=bo ß --h \ç - yJ:?c CO x D,ìaLe ?)\J ^(l~ -to:\ \cA C ~Io ' II /-\ Ù~.ct\1o Ú!D -; 1/ \¡1Aed \'e \ 'Ie ccz'D . \'51/ l\{\!lev OI.Þ' - dh\Æ~1~ 4ort'I,AAß\ V1 y- € c:hrw d -e t