Loading...
HomeMy WebLinkAbout0118215-Plumbing (sink) e OSHKOSH ON THE WATER Job Address 1020-1142SKOELLERST CITY OF OSHKOSH No 118215 PLUMBING PERMIT - APPLICATION AND RECORD Contractor D.R. HANSEN PLBG. Bathtub 0 Whirlpool 0 Lavatory 0 Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 0 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Use/Nature of Work Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 0 0 0 0 0 0 WaterSofiner Local Waste Clothes Wshr Bidet Beer Tap Lab Sink Owner KOELLER ONE LLC Create Date 02116/2006 Category 440 - Industrial-Interior Plan 0 0 0 0 0 0 0 0 0 Wai!.S!. Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink 0 Shamp Sink ~ 0 Flr/Wst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker ~ Int Grease Trap ~ Ex! Grease Trap ~ RPZValve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 0 Sterilizer 1 Dip Well 0 Drink Ftn Instail breakroom sink on existing drain/vent and water supply from former sink location. (Debit Account) Size Material Type # Conn. Type Sanitary Sewer 0 0 0 0 0 Storm Sewer 0 0 0 0 0 Water Service 0 0 0 0 Parcelld # 0 1308490000 Valuation $800.00 Plan Approval Issued By $0.00 Permit Fees $20.00 0 Permit V~ Date 02/16/2006 In the performance of this work. I agree to perform ail work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 55 KNAPP ST Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 233-1595 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.