HomeMy WebLinkAbout0118203-Building (interior remodel)
e
OSHKOSH
ON THE WATER
Job Address 305 OHIO ST
CITY OF OSHKOSH
No
118203
BUILDING PERMIT - APPLICATION AND RECORD
Owner JAMES H LANG PROPERTIES INC
Create Date
02/15/2006
Designer
Contractor
D & J QUALITY CONSTRUCTION
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Canst:
Size
Unfinished/Basement
----.CJ Sq. Ft.
----.CJ Sq. Ft.
Rooms
0
Height 0 Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
----.CJ Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units 0
# Structures
----.J}
Use/Nature K;omm/ Replace wall finish with drywall. install new cabinets and counter top display. NO STRUCTURAL CHANGES
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$0.00 Permit Fee Paid
$62.00 Park Dedication
$0.00
Date 02115/2006
Final/O.P. 00/00/0000
0 Pennit Voi~
Parcelld # 0603770000
In the performance of this work i agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it Is not a party, if you perform the work
described in this pennlt application within an easement. the City strongly urges the permit applicant to contact the easement
:~::e::::~f2"Y ~F~fore starting such activity. Date :z ~ 5~
//' AgenUOwner I
Address 2415 HICKORY LN OSHKOSH WI 54901 - 0000 Telephone Number 232-0538
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.