Loading...
HomeMy WebLinkAbout0118205-Building e OSHKOSH ON THE WATER Job Address 834 N MAIN ST CITY OF OSHKOSH No 118205 BUILDING PERMIT - APPLICATION AND RECORD OWner JAMES H LANG PROPERTIES INC Create Date 02/15/2006 Designer Contractor 0 & J QUALITY CONSTRUCTION Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -------.!J Sq. Ft. -------.!J Sq. Ft. Rooms Height 0 Ft. D~rojection I Finished/Living Bedrooms 0 Stories Canopies Garage -------.!J Sq. Ft. Baths 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures ~ Use/Nature ofWork omm/ Replace wall finish with drywall, install new cabinets and counter top display. NO STRUCTURAL CHANGES HVAC Contractor Plumbing Contractor CAL CONTRACTING SPECIALISTS $5,188.00 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Issued Date 02/15/2006 Final/O.P. 00/00/0000 D. Permit Voided I Parcelld#1001110000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perform the work described In this permit application within an easement, the City strongly urges the permit applicant to contact the easement :~~~~::::nd 1Õ~:~~¿::~: a~~~~ starting such activity. Date ,2 J/SJc;(ó ¿:_/ Agent/Owner I I Address 2415 HICKORY LN OSHKOSH WI 54901 - 0000 Telephone Number 232-0538 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.