Loading...
HomeMy WebLinkAbout0118195-Building e OSHKOSH ON THE WATER Job Address 2410W9THAVE CITY OF OSHKOSH No 118195 BUILDING PERMIT - APPLICATION AND RECORD Owner TIMOTHY A GRAY/RHONDAJ SASMAN Create Date 02/14/2006 Designer Contractor OWNER Category 140 - Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----------'! Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ----------'! Sq. Ft. Bedrooms 0 Stories Garage ----------'! Sq. Ft. Baths 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFRI Gutting the first fioor bathroom. Installing new fixtures. insulation. and drywall. An exhaust fan Is existing. ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: D,~ $5.000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 02114/2006 Final/O.P, 00/00/0000 0 Permit Voided I Parcelld # 0613930000 In the performance of tI1ls work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact tI1e easement holder(s) and Wsec ny nece iY efore starting such activity. )1 J Signature Date ---r..2-h'-ó!o Wi 54904 - 8050 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.