HomeMy WebLinkAbout0118195-Building
e
OSHKOSH
ON THE WATER
Job Address 2410W9THAVE
CITY OF OSHKOSH
No
118195
BUILDING PERMIT - APPLICATION AND RECORD
Owner TIMOTHY A GRAY/RHONDAJ SASMAN
Create Date
02/14/2006
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ----------'! Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ----------'! Sq. Ft. Bedrooms 0 Stories
Garage ----------'! Sq. Ft. Baths
0 Projection I
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
0
Use/Nature SFRI Gutting the first fioor bathroom. Installing new fixtures. insulation. and drywall. An exhaust fan Is existing.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: D,~
$5.000.00 Plan Approval
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Date 02114/2006
Final/O.P, 00/00/0000
0 Permit Voided I
Parcelld # 0613930000
In the performance of tI1ls work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact tI1e easement
holder(s) and Wsec ny nece iY efore starting such activity. )1 J
Signature Date ---r..2-h'-ó!o
Wi 54904 - 8050 Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.