Loading...
HomeMy WebLinkAbout0118186-Building e OSHKOSH ON THE WATER Job Address 370 W WAUKAU AVE CITY OF OSHKOSH No 118186 BUILDING PERMIT - APPLICATION AND RECORD Owner OSHKOSH TRUCK CORP Create Date 01/31/2006 Designer Contractor PACE CORPORATION Category 210 - Addition Industrial Plan Type . BulldiniL__O Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ------.2 Sq. Ft. ------.2 Sq. Ft. Rooms 0 Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies Garage ------.2 Sq. Ft. Baths Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 ~:~~~~ure ,office/Industrial - Install sprinkler system for addition. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuat 126,897.00 Plan Approval $0.00 Permit Fee Paid $445.00 Park Dedication $0.00 Issued By: Date 02/13/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1413490500 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address N694 COUNTY HWY CB APPLETON WI 54915 - 8598 Telephone Number 731-5281 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.