HomeMy WebLinkAbout0118175-Plumbing (water heater)
~ CITY OF OSHKOSH No 118175
OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 2030 SHERIDAN ST Owner SEAN UKARLANN HUTCHISON Create Date 02113/2006
Category 411 - Residential-Water Heaters Plan
Bathtub 0 Shower 0 Water Softner 0 Wait St. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0
Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 1 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Contractor J RASMUSSEN PLUMBING INC
Use/Nature
ofWork
REPLACE GAS WATER HEATER "DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1213030000
$600.00
Plan Approval
$0.00
Permit Fees
$20.00 D Permit Voided I
Valuation
Issued By
Date 02/13/2006
In the performance of this work. I agree to perform all work pursuant to rules govemlng the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a parfy.lfyou perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1914 GREENBRIAR TRL
AgenUOwner
OSHKOSH
WI 54904 - 0000
Telephone Number 920-233-6747
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.