HomeMy WebLinkAbout0118189-Building (siding/windows/drywall)
e
OSHKOSH
ON THE WATER
Job Address 1020CEAPEAVE
CITY OF OSHKOSH
No
118189
BUILDING PERMIT - APPLICATION AND RECORD
Owner ROBERT J/KRIS BAUMGARTNER
Create Date
02/13/2006
Designer
Contractor
OWNER
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ----2 Sq. Ft. Bedrooms Stories
Garage ----2 Sq. Ft. Baths 0
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
~:~~~~ure ~~Dg~~I~~n::1 ~~b;~~~~8~~~ REPLACING INSULATION AND DRYWALL. REPLACING THE SIDING, SOFFIT AND
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$7,500.00 Plan Approval
$0.00 Permit Fee Paid
$62.00 Park Dedication
$0.00
Issued By:
~
Date 02113/2006
Final/O.P. 00/00/0000
0 PenmitVolded
Parcelld # 0802720000
In the perfonmance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
x:
Date X
Address
1020CEAPEAVE
AgenUOwner
OSHKOSH
WI 54901 - 5420
Telephone Number
~þ~
(}'-IYÓro
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready-