HomeMy WebLinkAbout0118192-Building (doors & close up windows)
e
OSHKOSH
ON THE WATER
Job Address 101W18THAVE
CITY OF OSHKOSH
No
118192
BUILDING PERMIT. APPLICATION AND RECORD
Owner RICKY J SEARL II
Create Date
02/13/2006
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height ~ Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths 0
D Projection I
Canopies
Signs
Foundation
0 Poured Concrete 0 Floating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units -----9.
# Structures
-----9.
Use/Nature RES/ Replace 3 exterior doors, Abondon 3 windows (1 bedroom, 1 kitchen, 1 bathroom.)
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Date 02/13/2006
Final/O.P. 00/00/0000
Fees: Valuation
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
D Permit Voided I
Parcelld # 1401300000
In Ihe performance of this work i agree to perform all work pursuant to nules governing the described construction.
While tI1e City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, If you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvais before starting such activity.
Signature ~? tf7 ~~
AgenVOwner
Date ;).-/3-0(;;,
Address
101 W 18TH AVE
OSHKOSH
WI 54902 - 0000
Telephone Number
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.