Loading...
HomeMy WebLinkAbout0118192-Building (doors & close up windows) e OSHKOSH ON THE WATER Job Address 101W18THAVE CITY OF OSHKOSH No 118192 BUILDING PERMIT. APPLICATION AND RECORD Owner RICKY J SEARL II Create Date 02/13/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height ~ Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 D Projection I Canopies Signs Foundation 0 Poured Concrete 0 Floating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units -----9. # Structures -----9. Use/Nature RES/ Replace 3 exterior doors, Abondon 3 windows (1 bedroom, 1 kitchen, 1 bathroom.) of Work HVAC Contractor Plumbing Contractor Electric Contractor Date 02/13/2006 Final/O.P. 00/00/0000 Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: D Permit Voided I Parcelld # 1401300000 In Ihe performance of this work i agree to perform all work pursuant to nules governing the described construction. While tI1e City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, If you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvais before starting such activity. Signature ~? tf7 ~~ AgenVOwner Date ;).-/3-0(;;, Address 101 W 18TH AVE OSHKOSH WI 54902 - 0000 Telephone Number To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.