Loading...
HomeMy WebLinkAbout0118184-Building e OSHKOSH ON THE WATER Job Address 842 W 5TH AVE CITY OF OSHKOSH No 118184 BUILDING PERMIT - APPLICATION AND RECORD Owner NILAJSTALLER Create Date 02/13/2006 Designer Contractor OWNER Category 140 -Interior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----.CJ. Sq. Ft. Rooms Height 0 Ft. Finished/Living -----.CJ. Sq. Ft. Bedrooms 0 Stories Garage -----.CJ. Sq. Ft. Baths 0 0 Projection I Canopies -----.CJ. Signs -----.CJ. Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units ~ # Structures 0 Park Dedication Use/Nature SFR/ Remodeling the kitchen. The kitchen will be gutted. no walls will be moved. New insulation and drywall will be installed. ofWork HVAC Contractor Plumbing Contractor UNKNOWN Electric Contractor HOEHNE ELECTRIC Fees: Valuation Issued By: Ù JA- $15.000.00 Plan Approval $0.00 Permit Fee Paid $99.00 Park Dedication $0.00 Date 02/13/2006 Final/O.P. 00/00/0000 0 Peomit Voided I Parcelld # 0604670000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secu y necessary appro s before starting such activity. Signature AgenVOwner OSHKOSH Date ~ ::JJþ WI 54902 - 5841 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.