HomeMy WebLinkAbout0118184-Building
e
OSHKOSH
ON THE WATER
Job Address 842 W 5TH AVE
CITY OF OSHKOSH
No
118184
BUILDING PERMIT - APPLICATION AND RECORD
Owner NILAJSTALLER
Create Date
02/13/2006
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement -----.CJ. Sq. Ft. Rooms Height 0 Ft.
Finished/Living -----.CJ. Sq. Ft. Bedrooms 0 Stories
Garage -----.CJ. Sq. Ft. Baths 0
0 Projection I
Canopies -----.CJ.
Signs
-----.CJ.
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units ~
# Structures
0
Park Dedication
Use/Nature SFR/ Remodeling the kitchen. The kitchen will be gutted. no walls will be moved. New insulation and drywall will be installed.
ofWork
HVAC Contractor
Plumbing Contractor
UNKNOWN
Electric Contractor
HOEHNE ELECTRIC
Fees: Valuation
Issued By: Ù JA-
$15.000.00 Plan Approval
$0.00 Permit Fee Paid
$99.00 Park Dedication
$0.00
Date 02/13/2006
Final/O.P. 00/00/0000
0 Peomit Voided I
Parcelld # 0604670000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secu y necessary appro s before starting such activity.
Signature
AgenVOwner
OSHKOSH
Date ~ ::JJþ
WI 54902 - 5841
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.