HomeMy WebLinkAbout0118163-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 1081 BIRCH LN
CITY OF OSHKOSH
No
118163
BUILDING PERMIT - APPLICATION AND RECORD
Owner URSULA M MAURER
Create Date
02/02/2006
Designer
Contractor
SALZER SIDING
-------------
Category
141 - Exterior Remodeling
Plan
Type
. Buildln~
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
----2 Sq. Ft.
Rooms
Height
0 Ft.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
~Sq.Ft.
Baths
0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units -------.2
# Structures
-------.2
Park Dedication
Use/Nature SFRI Late permlV Replacing wood siding with vinyl and replacing 5 windows Covering overhang in aluminum.
ofWork
HVAC Contractor
Plumbing Contractor
Electric Contractor
$7.955.00 Plan Approval
CXfJ
$0.00 Permit Fee Paid __$162.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 02/10/2006
Final/O.P.~O/OO/OOOO
0 Permit Voided I
Parcelld # 1519629800
In the performance of this work I agree to perform all work pursuant to rules governing tI1e described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 825
AgenVOwner
OSHKOSH
WI 54903 - 0825
Telephone Number
(920) 231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.