Loading...
HomeMy WebLinkAbout0118169-Building (landing & steps off front porch) e OSHKOSH ON THE WATER Job Address 227 W 15TH AVE CITY OF OSHKOSH No 118169 BUILDING PERMIT. APPLICATION AND RECORD OWner PETER AIANGELA KELLER Create Date 02/10/2006 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. 0 Projection I Finished/Living Bedrooms Stories Canopies ~ Signs 0 Garage ~Sq.Ft. Baths 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Peomit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature SFR/ Constructing a max. (4'x6') landing and steps off the front porch. A minimum of 48" of frost protection is required in addition to code of Work compliant handrails and guardrails. HVAC Contractor Plumbing Contractor Electric Contractor Fees: valua~ Issued By: $500.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Date 02/10/2006 Final/D.P. 00/00/0000 0 Penmit Voided I Parcelld # 0902020000 In the performance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to s u any necessary ap 0 als before starting such activity. -). Signatur ~ d---!ð-O Co Address OSHKOSH ""'!.. 54902 - 6513 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.