HomeMy WebLinkAbout0118158-Plumbing (laterals)
e
OSHKOSH
ON THE WATER
Job Address 3175 WHITE TAIL LN
Contractor RADTKE CONTRACTORS INC
CITY OF OSHKOSH
No
118158
PLUMBING PERMIT - APPLICATION AND RECORD
Owner MIDWEST GENERAL CONTRACTORS INC
Create Date 02109/2006
Category 430 -IndustrIal-ExterIor (laterals)
Plan
Bathtub 0 Shower 0 Water Softner 0 Wait St. 0 Shamp Sink 0 Coffee Maker ~
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWstSink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink 0 Dishwasher 0 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters ~
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Dlsp 0
Misc. 0
Fixtures
Use/Nature
of Work
NEW MULTI-FAMILY 6" SANITARY SEWER AND 2" WATER LATERALS "DEBIT ACCT
Size Material Type # Conn. Type
Sanitary Sewer 6" Plastic Lateral 1 New
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 2" Plastic Lateral 1 New
0
0
0 Parcelld #
0
Valuation
$2,000.00
Plan Approval
$0.00
Permit Fees
$100.00 0 Permit Voided I
Issued By
Date 02109/2006
In the performance of this work, I agree to perform ali work pursuant to rules govemlng the descrIbed construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, If you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 6408 CROSS RD
Agent/OWner
WINNECONNE
WI 54986 - 9731
Telephone Number
(920)582-4114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.