AMENDMENT NO.5
FOR
AGREEMENT FOR ENGINEERING CONSULTING SERVICES
FOR
DESIGN AND CONSTRUCTION ENGINEERING SERVICES FOR.
INTAKE, TRANSMISSION MAIN AND PLANT MODIFICATION IMPROVEMENTS
PURPOSE
The purpose of this Amendment No.5 is to:
.
extend the overall tennination date for the Agreement, as previously amended, in order to
provide engineering services during construction beyond the original construction
completion date for City Contract 02-01.
.
provide compensation above the currently authorized not-to-exceed limit for project
close-out services.
TIME SCHEDULE
Under Article 4, TIME SCHEDULE of the Agreement, change "61" to "73".
3.
TERM OF AGREEMENT
Under Article 5, TERM OF AGREEMENT, change "July 1,2005" to "July 1, 2006".
4.
SCOPE OF SERVICES
The scope for engineering services during construction related to City Contract 02-0 I, Raw Water
Intake and Transmission Main shall remain unchanged. '
5.
SCHEDULE
Activities under this Amendment are authorized through July 1,2006.
6.
DELIVERABLES
The deliverab1es to be furnished by MWH shall be as required by the existing Agreement and
subsequent amendments.
7.
COMPENSATION
Payment to MWH for services authorized under this Amendment shall be on a cost plus fee basis,
with an estimated not-to-exceed ceiling of $7,000.
4JANO6
AMDT5
-1-
~,..
t",",.. --";.
IN WITNESS WHEREOF, the parties below have caused this Amendment No.5 to be executed on the date
written below by their authorized officers and representatives.
MWH AMERICAS, INC.
--tl~ 4s 0 (
BY:" .<~
Norman Ga ,ki '
Title:
Regional Manager
Date:
ó-l (Öb /~
l
CITY OF OSHKOSH
Recommended:
J)~ C-.~
Director of Public Works
By A
,~ / 4Üæmgcr
"~~TUb
qty Ct.,k ~
I certify that provision has been made to pay the liability that will accrue to the City of Oshkosh, Wisconsin,
under the within Amendment.
APPRocra. ." .
(1 ~~.
City Attorney .
4JANO6
AMDT5
-2-
?JJ; A ~~ AS> G. ~
Comptroller