HomeMy WebLinkAbout2006-Building
,
.e
OSHKOSH
ON THE WATER
Job Address 370 WYLDEWOOD DR
CITY OF OSHKOSH
No
118118
BUILDING PERMIT -APPLICATION AND RECORD
Owner RITA M GEAR
Create Date
0210612006
Designer
Contractor
SCENIC CONSTRUCTION
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
-----.2 Sq. Ft.
-----.2 Sq. Ft.
Rooms
Height
a Ft.
0 Projection I
Finished/Living
Bedrooms a
Stories
Canopies
Garage
-----.2 Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units a
# Structures
~
Use/Nature
of Work
ONDO/ Finishing off a portion of the basement for a family room and office area.
HVAC Contractor
MARTENS HEATING & COOLING
Plumbing Contractor
Electric Contractor
CUMINGS ELECTRIC INC
Fees: valua~
Issued By:
$7,800.00 Plan Approval
$0.00 Permit Fee Paid
$62.00 Park Dedication
$0.00
Date 02106/2006
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1632004000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to se/cu" ,.~ approval ore starting such activity. '-7.
Signatu ~ Date { 2-¿--ð6
OSHKOSH
WI 54901 - 0000
Telephone Number
236--8776
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
1'..
~ 1'..
0
()
J
--<:,
/6"1
3
,
=.
.. ó'
-!. .'"
.~ [
q, d
:L '-'
",c.v
,c
<J -2:. :y
f'.. "~ '><
\'f\VçC
'"
Q>
,c
~ ~
J 'I,
\J .k
¡ 6
u£
;: \
~ -t
- 9.,
(.Ll::C
]\ '
0,1
)
Ç' - I
~ <:ì'>
1 ~
~
_.---,---~-
Ä
...,
~
C
r
(..Y
c:
:5
Ì"
\{
/L.!'
\.<Ç
~
-tr:::
'"1\
t
--'
1/1
-
C-
,
,r{
.1