HVAC PERMIT. APPLICATION AND RECORD
Owner
ARTHUR E POMMERENING
Create Date 09/09/2005
Plan 01-67-0805
Contractor
CONDON TOTAL COMFORT
Category 510 -Ind. & Comm-Heating & Ventilating
I 1 Oil
1 I Solid
1"'1 Electric
0 Replace
U Steam
I I Solar
Fuel
1"'1 Gas
[7] New
n Other
System
~ Forced Air
I I Electric
U Radiant
1 I HotWater
~ AlC I
1 I Con. Burner I
. Not Applicable
U Vent
Heat Loss
K) As Approved
K ) As Per Plan
e ) Chimney B
e ) Existing
e ) Variable
I I Suppl.
e ) Direct Vent
Chimney Type K) Chimney A
BTU Rate
. Not Applicable
. Other
Value
Value
Use/Nature om/Install furnace and AlC and duct system for alterations to existing office area. - AFTER THE FACT PERMIT!
of Work
Fees: Valuation
$10,800.00
Plan Approval
$0.00
Permit Fee Paid
$163.00
Issued By:
Date 02106/2006
0 Permit Voided I
Parcelld # 0614030000
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
PO BOX 184
RIPON
WI 54971 -184
Telephone Number
920-748-5050
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.
I ""H '-0' :~:~G:~~: ~C~:~~::=~E ST A~~== '~BM720 - - o.
This form is required to be submitted by the supervising professional (architect, engineer, HVAC designer or electrical
designer) observing construction Of projects within buildings with total areas 50.000 cubic feet or greater and bleachers
(Comm 50.10/Comm 61,50), Failure to submit this form may result in penalties ss specified In Comm 5Q,26/Comm 61,23
and/or local ordinances. This form must be submitted prior to the plan approval expiration date or another submittal may
be required.
General Instructions: Prior to the initial occupancy of new buildings or additions and the final occupancy of
altered existing buildings, submit this completed and signed form to:
. The municipal building inspection office (refer to the plan approval letter for agency address !!!£!
. Safety and Buildings, 10541N Ranch Road Hayward, WI. 54843
Note: If the review was done by the municipality, the compliance statement goes only to the municipal building
inspector..A copy is not needed by Safety & Buildings.
Personallnrormation you provide may bð used for secondary purposes [Privacy Law, s, 15.04 (1 )(m).
1. PROJEC'fINFORMATION: Please fill In the following with Information from your plan approval letter.
Transaction 10 Number ~;}..o:::. "'ì3 Project Name ~rntnL~!C u I ~ ~\'tb VI L~C
Site Number Î ¡;, 4- L 'll.
Site location (number & street) ??" \.!.. ~ &:>..<,¡a ~u~ "51-
,.... City [J Village [J Town of O<>.\\.K-'~ County of l.J II..,-..)...~
2, PURPOSE OF THIS STATEMENT: (Check Box A, B, C, or D to Indicate purpose and complete any other
applicable boxes and information. Attach additional pages If necessary.)
Check those which epply: [J Building Object 10 # 'JiiI,J--IVAC Object 10 # ~"04 3 01
[J Lighting Object ID #
0 Partial Completion
Description of Portion Completed
A))\ Statement of Substantial Compliance
To the best of my knowledge, belief, and based on onsile observation, construction or the following building and/or HVAC
items applicable to this project have been completed in substantial compliance with the approved plans and
specificatIons,
0 BUILDING/LIGHTING ITEMS
1. Structural system Including .ubmlttaland erection of all building component.
(tru..e., precast, metal building, otc.)
2. Fire protection .ystems (sprinklers. alarm., .moka detectors) designed,
inttallod, and tested (Including forward flow on back flow devices) by
opproprJataly registered professional.
3. Shaft and stairway enclosure
4. Exits including exil and directional lights
5. Firo-rasiätivo construction, enclosure of hazards, flre walls, labeled doors, ola.s 'br. HVAC ITEMS
of construction, fire stopped penetration.
S. Sanit.tlon .y.tom (toilets, sink., drinking facilltlos)
7. Borrier-froolncluding Comm 16 olevotors and lifts
8. Enorgy envelope requirement.
9. All conditions of building plan approval end applicable varlonce.
The followIng items ore not In oompliance and must be addressed:
10. Exterior lighting & control requirements
11. Interior lighting & control requirements
12. All conditions of lighting plan approval
and applicable varianco.
1, HVAC syotem Including nnal t.st
2. All cond~ions of HVAC plan approv.1 and
applicable variances
'B~GcI- ~~t.I'-'.S
B) 0 Statement of Noncompliance
Due to the following Ii.tod violations. this project is not ready for occupancy:
C) 0 SupervIsing Professional Withdrawn From Project (u.o A or B above to Indlceta project stat'" as or thio date.)
D) [J Project Absndoned
3. SUPERVISING PROFESSIONAL ~GNATURE FOR:
c Building ~ HVAC 0 Lighting .'R:f'"lh.l1i! W"'--~ Ù Date ~S Ie\"
erLb Name (ploa.. print Or type) ~ r') . . \ \
Phon. number "1.~~.~ CuslomerlD# ~AA\)..", Signalur.~~
"