Loading...
HomeMy WebLinkAbout0118126-Building (windows) e OSHKOSH ON THE WATER Job Address 1618 MINNESOTA ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 118126 Owner GERARDO G/KRIST MACHADO Create Date 02/06/2006 Designer Contractor OWNER Category 141 - Exterior Remodeiing Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ------.i> # Structures ------.i> Use/Nature of Work FR/ Installation of 16 repiacementwindows (same size and location). HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 02/06/2006 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0907990000 in the perfonmance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmit appiication within an easement, the City strongly urges the penmit appiicant to contact the easement h~lder(S) and to se ny eces approvals bef re starti such activity. ~ / /¿, ~ 1- Signature Date 1 Y I V ~p AgenUOwner Address 2515 LAMPLiGH OSHKOSH WI 54904 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.