Loading...
HomeMy WebLinkAbout0118099-Building (windows) e OSHKOSH ON THE WATER Job Address 1706 LIBERTY ST CITY OF OSHKOSH No 118099 BUILDING PERMIT -APPLICATION AND RECORD Owner LISA C A GOETSCH/CHARITY S CH Create Date 02/06/2006 Designer Contractor SEARS HOME IMPROVEMENTS Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. D Projection I Finished/Living Canopies Garage ~Sq.Ft. Signs Foundation . Poured Concrete 0 Floating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units ~ # Structures ~ Use/Nature ofWork FRiInstall18 replacement windows. no size or design changes - NO STRUCTURAL WORK HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $16,228.00 Plan Approval $0.00 Permit Fee Paid $109.00 Park Dedication $0.00 Issued By: Date 0210612006 Final/D.P. 00/00/0000 D Permit Voided I Parcelld # 1207740000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 13040W LISBON RD AgenVOWner BROOKFIELD WI 53005 - 0000 Telephone Number 630-832-4049 To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.