HomeMy WebLinkAbout0118102-HVAC (boiler)
e
OSHKOSH
ON THE WATER
Job Address 37 FRANKFORT ST
CITY OF OSHKOSH
HVAC PERMIT - APPLICATION AND RECORD
No
118102
Owner
TODD A KAUFMANN
Create Date 02/06/2006
Plan
Contractor STEINBRUNER HEATING & COOLING
I~I Gas I I Oil
Fuel
System n New
U Forced Air U Radiant
I I Electric I~I HotWater
Chimney Type U Chimney A . Chimney B
Heat Loss K ) As Approved . Existing
BTU Rate K) As Per Pian ( ) Variable
Category 500 - Residential-Heating & Ventiiating
I I Eiectric
P1 Replace
I I Solar
I I Solid
D Other
U AlC I U Vent
I I Con. Bumer I
( ) Not Applicable
U Steam
I I Suppl.
() Direct Vent
( ) Not Applicable
. Other
Value
Value
Use/Nature fSFRI Replace boiler, EIV provided by Seckar Elect. - No Chimney LIner being installed -Where an appliance Is penmanently disconnected
of Work rom an existing chimney or vent (CN), the CN shall be reslzed as necessary to control flue gas condensation in the interior of the CN and
0 provide the appliance or appliances served with the req. draft.
$2,200.00
Plan Approval
$0.00
Permit Fee Paid
$38.00
Date 02106/2006
Fees: Valuation
Issued By:
D Permit Voided I
Parcelld # 0805770000
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Agent/Owner
Address
600 OREGON ST
OSHKOSH
WI 54902-0
Telephone Number
(920) 426-1830
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.